Refurbishing of the Bolzano viaduct and noise barrier on the viaduct

Hydrodemolition of the damaged concrete of the Bolzano Viaduct (L=2560 meters), supporting structure rectified with cement render, and construction of a noise barrier on the north- and southbound traffic lanes.

Autostrada del Brennero S.p.A.

1999 2000

€15.300.000