Construction of an underpass below the railroad line, 10.50 m wide and 52 m long, using a tunnel jacking method, and various technologies for the removal of ground water.
Autonomous Province of Bolzano
2001 2003
€1.960.000
Construction of an underpass below the railroad line, 10.50 m wide and 52 m long, using a tunnel jacking method, and various technologies for the removal of ground water.
Autonomous Province of Bolzano
2001 2003
€1.960.000